|
1, gas supply
(1) with 90PSI (6.2 Bar) clean, dry air supply tools. High pressure can quickly reduce tool life.
(2) using tools chart with the proper size of components, tube and hose connection tools.
(3) if the use of air pressure regulator, air pressure setting in 0.62 MPA pressure output.
Step 2,
(1) will be connected to the air line pneumatic tool.
(2) set good air pressure.
(3) air line must set air, if air lubricating oil device unqualified or device, shall give below the tools for routine maintenance:
A continuous work after 3 to 4 hours, tools and air, into separate from the drip drip 7-8 high-purity light oil (low viscosity), then open air links trachea, will blow into oil cylinder. Conditional users and working intensity and Suggestions in the air filled with small injector double-quick.
B. usually 30-40 days need to air compressor and oil-water separator drain, periodically to ensure impurities, maintenance, air clean and the tool into dry.
Home
| About us | Certificate | News | Products | New Products |
Feedback | Tool Maintenance | Contact us Copyright © 2010 Yongkang Yueyang Hardware Tools Co.,lltd All Rights Reserved. Manage |